minus-squareWanderingCat@lemm.eetoTechnology@lemmy.world•*Permanently Deleted*linkfedilinkEnglisharrow-up4·edit-26 months agoI don’t know if they got the substation built, but last year they weren’t able to get enough power from the grid, so installed 14 generators (at 2.5mw each) to cover their needs https://www.datacenterdynamics.com/en/news/elon-musks-xai-data-center-adding-to-memphis-air-quality-problems-campaign-group/ linkfedilink
minus-squareWanderingCat@lemm.eetoTechnology@lemmy.world•Facebook Pushes Its Llama 4 AI Model to the Right, Wants to Present “Both Sides”linkfedilinkEnglisharrow-up15·8 months agoMistralAI look to be something along those lines linkfedilink
I don’t know if they got the substation built, but last year they weren’t able to get enough power from the grid, so installed 14 generators (at 2.5mw each) to cover their needs
https://www.datacenterdynamics.com/en/news/elon-musks-xai-data-center-adding-to-memphis-air-quality-problems-campaign-group/